Lenze EMB934x Bedienungsanleitung Seite 129

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 206
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 128
Commissioning
Initial switch−on
6
129
EDBMB9340 DE/EN/FR 12.0
6 Commissioning
6.1 Initial switch−on
Stop!
ƒ Prior to initial switch−on check the completeness, polarity, short circuit and
earth fault of the drive system wiring.
ƒ Keep to the switch−on sequence!
1. If 935x brake choppers are integrated into the drive system:
– Ensure the mains supply is switched−off.
– Use switches S1 and S2 to adapt the 935x brake chopper to the mains voltage (see
documentation for the brake chopper).
2. Switch on the mains.
– The drive system will be ready for operation after approx. 0.5 s.
3. Control the readiness for operation via both LEDs at the front of the regenerative
power supply module:
Status Description
green red
on off l The regenerative power supply module is connected to the mains voltage and is ready for
operation.
l No faults.
off on Active fault
off off l Mains voltage is switched off
l Mains phase L2 or L3 failed
4. Adapt all controllers which are connected to the drive system to the mains voltage
(under C0173).
Seitenansicht 128
1 2 ... 124 125 126 127 128 129 130 131 132 133 134 ... 205 206

Kommentare zu diesen Handbüchern

Keine Kommentare