6.1 Time load of the PLC cycle
The function blocks are cyclically called. The PLC cycle is permanently under load.
The exact processing time depends on the computing po wer of the CPU.
If real communication takes place, processing takes longer than if a block is activated without a
command to be processed.
When the PLC program is complete, the cycle load can be reduced by activating the expert
mode.
(^ 96)
The below table lists typical processing times for two different CPU types:
Block number Processing time
Operation CPU 412-2 DP (S7-400) CPU 315 -2 DP (S7 -300)
FC90 <0.1ms 0.6 ms
FC91 <0.1ms 0.7 ms
FC92 <0.1ms 0.6 ms
FB90 <1ms 1 ... 7 ms
Expert mode <1ms 1 ... 3 ms
Idle running <1ms 1 ... 2 ms
FB91 1 ... 7 ms
Eypert mode 1 ... 3 ms
Idle running 1 ... 2 ms
6.2 Transfer times
The following characteristics are important for the transfer times.
Tip!
Please note that the times indicated are minimum values.
If PROFIBUS is under high load or if a complex program i s to be proce ssed, times will rise
accordingly and may be considerably longer.
Communication disturbances and access to PROFIBUS devices tha t are not available may
substantially affect transfer times.
Transfer times also depend o n the operating system used. For optimum transfer times, we
recommend to use Windows NT, Windows 2000 or Windows XP.