6 Commissioning of the system: standard procedure
54 Lenze · Controller-based Automation · System Manual · DMS 1.4 EN · 04/2014 · TD17
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Field devices
commissioning
• Use the gateway function of the
controller to parameterise the field
devices.Sample topology 2:
Separate control and visualisation
( 36)
--
Create a visualisation • In the case of panel controllers, the
integrated monitor panel makes it
possible to display a visualisation in
parallel to the control program.
• Visualisation of programs of the
automation system
• Creation of the visualisation/user
interface
• Download of the visualisation to
the controller
---
Back up data • Backup of controller data Backup
( 25)
• More information can be found in
the online help for »Backup &
Restore«.
»Backup & Restore«
Diagnostics • Diagnostics of the controller
• Diagnostics of the field devices via
the gateway function of the
controller.
• Showing the logbook information
of the controller.
From V1.2
SP1
--
• Diagnostics of the controller
• Showing the logbook information
of the controller.
»WebConfig« via web browser
What would you like to do? Description Which Lenze Engineering tool?
»EASY
Starter«
»Enginee
r«
»PLC
Designer
«
V3.x
»VisiWin
NET«