
6 Commissioning of the PROFINET
6.2 The commissioning steps in detail
28
Lenze · Controller-based Automation · PROFINET® Communication Manual · DMS 1.2 EN · 04/2014 · TD17
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
6.2.8 Creating a control configuration (adding field devices)
How to create the control configuration in the »PLC Designer«:
1. Go to the context menu of the target system (device, Lenze Controller ...) and use the
Add device command to extend the control configuration by the PROFINET I/O
device.
Note!
The PROFINET Lenze Controller is exclusively configured using the »PLC Designer«.
Other Lenze field devices receive their PROFINET configuration from the higher-level
control (e.g. via the »STEP7« project of a Siemens SIMATIC S7 PLC).
Kommentare zu diesen Handbüchern