Lenze i700 Manual Bedienungsanleitung Seite 101

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 159
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 100
Electrical installation
Preparations
Integrated PE conductor connection
6
101
EDS700ACBA EN 4.0
6.5 Preparations
When the mechanical installation has been completed, the electrical wiring starts with the
creation of the integrated electrical connections:
6.5.1 Integrated PE conductor connection
How to proceed:
ƒ Use the swivel hook to establish the PE conductor connection of the devices.
– Loosen the screws
– Turn the swivel hook into the right position
– Fasten the screws
ƒ At the left and right device of an installation row, attach the PE connection twice
conforming to standards.
ƒ Then attach the shield connection sheet.
i700A00x
Terminal data
Conductor cross−section Tightening torque
[mm
2
] [AWG] [Nm] [lb−in]
Swivel hook 2.5 22.1 PH 2
i700M00x
Seitenansicht 100
1 2 ... 96 97 98 99 100 101 102 103 104 105 106 ... 158 159

Kommentare zu diesen Handbüchern

Keine Kommentare