Lenze L-force I/O System 1000 Bedienungsanleitung Seite 16

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 99
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 15
L-force Controls | I/O System 1000
Configuring the station structure
Search for connected devices
16 L 2.0 EN - 11/2010
Step 3 - Storage location
6. The Name entered before is suggested as project name. If required, change the
suggestion accordingly.
The project name is also the name for the project directory to be created.
7. Enter the filing location for the project directory in the Directory input field.
If the indicated directory is not available, it will be recreated.
You can optionally select an available directory via the Browse... button.
8. Press Complete.
Seitenansicht 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 98 99

Kommentare zu diesen Handbüchern

Keine Kommentare