Lenze L-force I/O System 1000 Bedienungsanleitung Seite 18

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 99
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 17
L-force Controls | I/O System 1000
Configuring the station structure
Creating a new project (select component from catalogue)
18 L 2.0 EN - 11/2010
3.2 Creating a new project (select component from catalogue)
You can create a new project in the »Engineer« without being online. After having
configured the project, go online with the I/O system 1000 to transfer parameters.
How to create a new project with components:
1. If the start-up wizard has not been displayed yet, click the icon or select the
FileNew... command to call the start-up wizard.
Step 1 - What would you like to do?
2. Select the Select component from catalogue option.
3. Press Next.
Seitenansicht 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 98 99

Kommentare zu diesen Handbüchern

Keine Kommentare