Lenze · Drive Solution Designer · Manual · DMS 4.2 EN · 12/2013 · TD23 349
11 Drive Dimensioning
11.6 Inverters
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
11.6.1.3 Overcurrent operation for Servo Drives 9400
The inverters are designed for two overcurrent modes:
•Cycle of 5 s
• Load period of 0.5 s with peak current
• Recovery time of 4.5 s with limited current
•Cycle of 3 min
• Load period of 1 min with peak current
• Recovery time of 2 min with limited current
After a load period with a peak current a recovery time has to follow. During the recovery time the
current may not exceed the value specified.
The values specified refer to the rated output current I
N,out
.
[11-20] Overcurrent capability for Servo Drives 9400 at 45 °C
Cycle of 5 s
Peak current for 0.5 s
Max. current during the recovery time for 4.5 s
Cycle of 180 s
Peak current for 60 s
Max. current during the recovery time for 120 s
t
0
100
2
0
13
0.5 s
4.5 s
60 s 120 s