14.1 Lenze BlueGreen Solutions
• Go to the "Protocol" dimensioning step and click the button to open the Lenze BlueGreen So-
lutions dialog box.
14.1.1 Basic data for the calculation of energy costs
Basic data for the calculation of energy costs ( 379)
Project data
( 380)
Diagrams and project comparison
( 381)
Cost comparison TOP 3
( 381)
Open the comparison protocol
• Comparison of data and costs of the drive systems considered in the comparison.
• The output format is adjustable. Output settings
( 393)
Designation Description
Currency Definition of the currency unit
• The currency is used for all calculations of energy costs.
Energy rate k
e
Price per energy unit
Period under consideration T The energy costs are calculated for the given period.
• The period under consideration can be, for instance, the time of amortisation.
• In the "Cost" diagram, the period under consideration is selected.
• Possible time units:
•D: Day
•M: Month
•Y: Year
Operating hours per day Operating time of the drive system: Average hours per day
Operating days per week Operating time of the drive system: Average days per week
Operating weeks per year Operating time of the drive system: Average weeks per year